New: E-Signature is now available →
← All Airtable templates

Airtable Change Order Template for Google Docs

A change order for construction and renovation projects: the items and vendors affected, builder fee, tax, insurance and the delay in weeks. Filled from Airtable and sent to your clients to accept.

20 free documents · No credit card

Change order template preview - Google Docs template for construction change orders generated from Airtable data

The variables in this template

One table for change orders, one linked table for the items changed. Map each variable to one of your fields in TypeFlow, or rename it in the Doc to your field name.

Change order record

HoldsVariable in the template
Clientsclient_1_full_name, client_2_full_name, last_name
Project addressaddress
Delaynumber_of_weeks
Builder feebuilder_fee_percent, builder_fee
Tax, insurance, warrantytax, insurance, warranty
Vendor costs and totalvendor_costl, order_total
Photosimage_attachments

Items changed (linked records)

HoldsVariable in the template
Itemitem
Vendorvendor
Costcost

Each linked item becomes one row of the change order.

How it works

  1. 1

    Copy the template

    It opens in your Google Drive. Change the layout, fonts and logo like any document.

  2. 2

    Map your Airtable fields

    Pick your base and table in TypeFlow, then match each {{variable}} to a field.

  3. 3

    Generate from Airtable

    Click a button on the record or let an Airtable automation run it. The PDF lands in an attachment field.

Get it accepted in one click

Send the change order from the same flow. Your client reads it and clicks Accept, with nothing to draw. A Certificate of Acceptance is attached and the accepted PDF is written back to your Airtable attachment field.

How acceptance works →

Questions

Do I need a Google account?
Yes. The template is a Google Doc: you copy it to your Drive and edit it there. TypeFlow also has its own template builder if you prefer not to use Google.
How do the line items get into the table?
From a linked table in Airtable. TypeFlow repeats the table row once per linked record.
Does my client have to draw a signature?
No. In acceptance mode they read the document and click Accept. It is a simple electronic signature under eIDAS and the ESIGN Act, recorded in a Certificate of Acceptance.

Generate your first change order from Airtable

20 free documents · No credit card

Airtable Change Order Template for Google Docs | TypeFlow